Central 70 Project
Denver, Colorado
As part of CDOT’s Central 70 Project, NPW Contracting provided spray-applied bridge deck waterproofing on the BNSF and Union Pacific Railroad bridges carrying rail traffic over the reconstructed I-70 corridor.
Working for Kiewit Infrastructure within a demanding transportation and railroad environment, NPW’s crews prepared the bridge decks, applied primer, and installed a continuous, fully bonded Bridge Preservation BDM™ membrane (now PPG). The system provides seamless protection against water, deicing chemicals, ballast abrasion, and other conditions that can contribute to bridge deck deterioration.
Owner: Colorado Department of Transportation (CDOT)
General Contractor: Kiewit Infrastructure
Location: Denver, Colorado
Scope: Spray-Applied Bridge Deck Waterproofing
System: Bridge Preservation BDM™ (now PPG)
Structures: BNSF and Union Pacific Railroad Bridges

NPW Project Scope
- Bridge deck surface preparation
- Primer application
- Spray-applied Bridge Preservation BDM™ membrane
- Continuous, fully bonded waterproofing system
- Quality control and documentation, including temperature, dew point, film thickness, and bond strength testing
- Waterproofing of the BNSF and Union Pacific Railroad bridge structures